What a way to wrap up our week with the Cemplas team in top form!
Our completed Sikalastic Rapid system works are looking superb at Great Yarmouth Police Investigation Centre – and the PMMA technology ensured that the system provided the speed of cure that was required.
Full credit to the team on this one – the workmanship is second to none. Congratulations everyone!
