Our team are still on site working on the 13th floor at a hotel in London where they’re tasked with repairing the beams and columns around the rooftop where the plant is stored.

  • Hammer tests were conducted before the breaking out/removal of spalled or unsound material.
    Applied corrosion protection to the steels and installed anodes before concrete repairs were completed.
    Anti-carbonation coatings were applied to the repaired areas.
    Render repairs also completed with a fairing coat to repair hairline cracks.