Scope

  • Block Paving
    Drainage
    Re-Waterproofing
    External Decorations

Details

  • Basement car park
    >100lm of block paving and sub-base excavation
    Re-waterproofed with Sikalastic 8800
    Reinstatment of block paving
    > 40lm of new drainage channels installed
    Stone stair treads replaced following re-waterproofing

The scope of this refurbishment was to re-waterproof areas of the surface car park and entrance steps directly adjacent to the building’s undercroft car park.

Before: Leaking Entrance Steps

During: Block Paving Removal & Excavation

After: New Pedestrian Walkway

The block paving and sub-base around the perimeter of the building had to be removed followed by excavation to expose the existing concrete surfaces of the capping beams. Following the installation of new ACO drainage channels to the entrance and exit ramps, Sikalastic 8800 was hot-spray applied to re-waterproof the excavated areas. After back-filling, the original pavors were reinstated with the addion of new yellow paving creating a pedestrian walkway.

With water ingressing to the undercroft car park via the existing entrance steps, these were removed and replaced with new stone treads installed following the application of the Sikalastic waterproofing system. Re-waterproofing works adjacent to the exit ramp were also required to make watertight.

Landscape works also saw the removal of hedges surrounding the front of the building and replaced broken slate to reduce ongoing maintenance needs.