Works are now underway to the grade II listed building Nashdom Abbey which is currently having water ingress issues from two terraces.
Our programme of works include:
Vapour control layer
Tapered insulation scheme
Application of Sikalastic 625
We love to see what a difference Team Cemplas can make!
![Nashdom Abbey Nashdom Abbey](https://cemplas.co.uk/wp-content/uploads/2023/07/Nashdom-Abbey.jpg)