Client: Bouygues
Role: Specialist Sub-Contractor
Scope
- Walkway Resurfacing
Details
- 5 no. courtyards around the hospital
Resin bonded aggregate system to walkways
600m² of new surfacing
Renew timber edging
The courtyards around the hospital were in very poor condition and beyond serviceable life. Cemplas were engaged by Bouygues to replace the existing poor quality surfacing whilst at the same time improving safety (slip-resistance) and aesthetics.
Before: Existing Surface Beyond Repair
Before: Sub-Base Repairs Required
Before: Poor Aesthetic Impact
With awareness of the sensitivies of the hospital environment – in particular to keep noise and disruption to a minimum – super-silent plant was utilised throughout our works. Following complete removal of the existing surface, localised repairs were required to the sub-base prior to replacement with the new resin-bonded surface.
Remmers’ Resin Bonded Aggregate Pur Grip 100 system was installed to the 5 courtyards around the hospital – totaling 600m² – at a thickness of approximately 3mm. All perimeter timber edging was also replaced within this 4-week contract with sequencing works playing an important part.
After: Repaired & Replaced
After: Timber Edging Renewed
After: Significant Aesthetic Improvements